The Building Relocation Experts

  PORTFOLIO | SERVICES | CONTACT US | HOME 

PORTFOLIO - Commercial Projects

40×140 Steel Barge

This 40’ X 140’ X 9’ steel barge was dry docked for bottom replacement in 2001. In February of 2002, the 220-ton barge was loaded onto steel skates and hydraulic dollies and launched into the Okeechobee Waterway for Maritime Tug and Barge of Stuart, Florida

 

76 Ton Tugboat

This new tugboat was built at a facility about a Quarter mile away from the water. The steel boat measuring 26’ wide and 58’ long at 76 tons was loaded on steel beams and dollies, spun 180 degrees, backed down the road and launched for Al Sanford of Titusville in 2000.

 

250 Ton Office Complex

This office complex was on the site of a proposed office building. The structure, measuring overall 108’ wide and 120’ long at 250 tons, was relocated to the adjacent lot to make way for the new building for Lockheed-Martin Defense plant in Orlando, June, 1986.

 

245 Ton Office Building

This office building was on the site of the proposed parking lot addition for Koster's Market in Jupiter.

 

Vic Osman Sales Office Building

This sales office building was on the site of the new sales office at Vic Osman Jeep-Eagle Dealership in Melbourne .

 

50 Ton Paddleboat

This new paddleboat was built in a warehouse with 8” of clearance above and below it.

 

Landing Craft 272 Ton

This Landing Craft was dry docked on a barge for renovation and repairs. When the vessel was ready to be launched, the water level in the Okeechobee Waterway was so low that the barge was grounded.

 

Modular Office Building

This modular office building is one of two buildings in the way of new construction at the University of Central Florida.

 

40×140 Steel Barge

This 40’ X 140’ X 9’ steel barge was dry docked for bottom replacement in 2001. In February of 2002, the 220-ton barge was loaded onto